Turnkey powder coating plant
A turnkey powder coating plant is a complete line, from washing to curing, engineered, built, installed and commissioned by Adencoat as one project. The example line has two washing stages, a 10 m drying oven, a cyclone robotic booth, a 20 m curing oven, a cardan chain conveyor and a PLC panel.
| Scope | Washing, drying, booth, curing, conveyor |
|---|---|
| Control | PLC panel |
| Delivery | Installation and commissioning |



Technical data
The table shows the standard size. Values marked per project are set from your part and line and appear in the proposal, with the drawing for your size.
Quote for your dimensions| Pretreatment | 2-stage spray washing line |
|---|---|
| Drying | 10 m spray drying oven |
| Application | Cyclone-type robotic powder booth |
| Curing | 20 m straight tunnel curing oven |
| Handling | Cardan chain conveyor line |
| Control | PLC-controlled electrical panel |
How we size it
We start from three inputs: the largest part, the parts per hour and the hanging pattern. From them follow the line speed, the oven lengths, the booth openings, the pretreatment stages and the conveyor load. The sizing guide shows the arithmetic for each station.
What it is for
- New coating shop installation
- Renewal or relocation of an existing line
Options
- Manual, automatic or mixed application
- Gas-fired or electric ovens
- Stage count and chemistry per corrosion class
- Installation on site in about four weeks for a line of the example size
Standards
ATEX-certified components in classified zones, CE Declaration of Conformity for the line. Booths to EN 16985:2018, ovens to EN 1539:2015, automatic powder equipment to EN 50177.
Values marked "Per project" in the table are set from your part and line, and appear in the proposal.
Complete powder coating line, installed 2024
Photographed on site, before hand-over. Every project is listed with its equipment and without the customer's name. Projects
Downloads
Quote for the turnkey powder coating plant
Send the part size, quantity and line speed; we reply within 2 working days.